PHASES OF BUILDING CONSTRUCTION

BUILDING CONSTRUCTION

  • The process of assembling or erecting structures on a designated site.
  • It involves unloading plant, machinery, materials, cladding, fixture, fitting of installations, formwork, and external finish. 
  • The primary goal of building construction is to create functional, safe, and aesthetically pleasing spaces that fulfil specific purposes, such as residential, commercial, industrial, or institutional use.
  • The building construction process is a series of routine tasks completed by skilled persons.

PHASES OF BUILDING CONSTRUCTION

The building construction is split into three phases

  1. Pre-construction.
  2. Construction.
  3. Post-construction. 

1. Pre-construction

Planning and Design:

  • Conceptual Design: Development of initial ideas and sketches.
  • Feasibility Study: Assessing project viability, including budget, site conditions, and regulatory requirements.
  • Architectural and Engineering Design: Creating detailed plans and specifications for structural, electrical, mechanical, and plumbing systems.

Site Analysis and Preparation:

  • Site Surveys: Conducting soil testing, environmental impact assessments, and topographical surveys.
  • Permits and Approvals: Obtaining necessary permits from local authorities and ensuring compliance with zoning laws and building codes.
  • Budgeting and Scheduling: Developing a detailed cost estimation and project timeline.
  • Contracting: Selecting contractors and signing construction contracts.

2. Construction

Site Preparation:

  • Clearing and Excavation: Removing vegetation, debris, and leveling the site.
  • Grading and Utilities Installation: Adjusting the land slope for drainage and installing temporary utilities such as water, electricity, and sanitation.

Foundation and Framing:

  • Foundation Work: Pouring concrete footings and constructing foundation walls, including basements if applicable.
  • Structural Framing: Erecting the structural framework, including beams, columns, floors, and roof structure.

Building Systems Installation:

  • Mechanical, Electrical, and Plumbing (MEP): Installing HVAC, electrical, and plumbing systems.
  • Insulation and Waterproofing: Adding insulation and ensuring the building is watertight.

Exterior and Interior Finishes:

  • Exterior Work: Constructing exterior walls, installing windows and doors, applying siding or other finishes.
  • Interior Work: Building interior walls and partitions, applying plaster or drywall, installing flooring.
  • Finishing Touches: Painting, decorating, installing cabinetry, fixtures, and trim work.

3. Post-construction

Final Inspections and Handover:

  • Quality and Regulatory Inspections: Conducting final quality checks, ensuring compliance with building codes, and addressing any issues.
  • Punch List: Identifying and rectifying any remaining defects or incomplete work.
  • Occupancy Permit: Obtaining the permit for occupancy and officially handing over the property to the owner.

Project Closeout and Evaluation:

  • Documentation: Compiling and handing over all project documentation, including warranties, manuals, and as-built drawings.
  • Maintenance Plan: Establishing a maintenance plan for the property.
  • Post-occupancy Evaluation: Reviewing the project to assess performance, gather feedback, and identify lessons learned for future projects.

These three stages encompass the entire lifecycle of a building construction project, from initial planning and preparation through to the completion and evaluation of the finished structure.